Search Results

Below are the search engine results of your query.

Showing 2381-2390 of 3078 results

PFAS NON-TARGETED ANALYSIS AND METHODS INTERIM REPORT #5

Process and Non-Process Wastewater and Stormwater

PFAS NON-TARGETED ANALYSIS AND METHODS DEVELOPMENT PLAN January 2019

Process and Non-Process Wastewater and Stormwater

PFAS CHARACTERIZATION SAMPLING PLAN December 2018

Process and Non-Process Wastewater and Stormwater

CHARACTERIZATION OF PFAS IN PROCESS AND NON-PROCESS WASTEWATER AND STORMWATER Quarterly Report #3 January 2020

This report was prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours) to provide a quarterly update on the identification and concentrations of per- and polyfluoroalkyl substances (“PFAS”) in process wastewater, non-process wastewater, and stormwater at the Chemours Fayetteville Works, North Carolina site (the Facility, Figure 1).

The Chemours Company FC, LLC 250 Cheesequake Road Parlin, NJ 08859 USA

The manufacture of Fluoroproducts.

Submission of Site Associated PFAS Fate and Transport Study Pursuant to Consent Order Paragraph 27 June 2019

Enclosed, please find a PDF copy of the Site Associated PFAS Fate and Transport Study for the Chemours Fayetteville Works.

Out Outfall 002 GAC Pilot Study Interim Results Report Chemours Fayetteville, North Carolina Facility August 2019

Parsons Infrastructure (Parsons) is pleased to present this interim report summarizing results obtained todate during operation of the Old Outfall 002 (OOF2) GAC pilot treatment system.

CHARACTERIZATION OF PFAS IN PROCESS AND NON-PROCESS WASTEWATER AND STORMWATER Quarterly Report #1 July 2019

This report was prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours) to provide a quarterly update on the identification and concentrations of per- and polyfluoroalkyl substances (“PFAS”) in process wastewater, non-process wastewater, and stormwater at the Chemours Fayetteville Works, North Carolina site (the Facility, Figure 1).

Submission of Offsite Screening Level Exposure Assessment of Site-Associated PFAS – Workplan, Chemours Fayetteville Works, Fayetteville, NC. July 2019

Enclosed is the Offsite Screening Level Exposure Assessment of Site-Associated PFAS [SLEA] – Workplan prepared by our consultant Geosyntec Consultants of NC, PC.

Notification Pursuant to Proposed Consent Order Paragraphs 12(c) and 27

Pursuant to the requirements of Paragraphs 12(c) and 27 of the proposed Consent Order, Chemours is notifying the Department of Environmental Quality (“DEQ”) of the third-party that it has selected to undertake certain obligations in the Consent Order.