Search Results

Below are the search engine results of your query.

Showing 1841-1850 of 3078 results

Consent Order Addendum - Submission Pursuant to Paragraph 2.a

Please find enclosed the Interim Seep Remediation Operation and Maintenance Report #4.

Please find enclosed the Interim Seep Remediation Operation and Maintenance Report #5

Please find enclosed the Interim Seep Remediation Operation and Maintenance Report #5.

Please find enclosed the Interim Seep Remediation Operation and Maintenance Report #6

Please find enclosed the Interim Seep Remediation Operation and Maintenance Report #6.

INTERIM SEEP REMEDIATION OPERATION AND MAINTENANCE REPORT #1 COVER LETTER

Geosyntec Consultants of NC, PC (Geosyntec) has prepared this Interim Seep Remediation Operation and Maintenance (O&M) Report #1 (“O&M Report”) on behalf of The Chemours Company FC, LLC (Chemours) to provide a bi-monthly (every two months) summary report of Operations and Maintenance for the flow-through cell (FTC) installed as the interim remediation system at Seep C at the Chemours Fayetteville Works Site (the Site).

Interim Seep Remediation Operation and Maintenance Report #11

Interim Seep Remediation Operation and Maintenance Report #11

CHARACTERIZATION OF PFAS IN PROCESS AND NON-PROCESS WASTEWATER AND STORMWATER

Paragraph 11(d) Ongoing Sampling Final Report: 2021 – 2022 Bimonthly Sampling

STORMWATER TREATMENT SYSTEM SAMPLING PLAN

Geosyntec Consultants of NC, PC (Geosyntec) has prepared this Stormwater Treatment System Sampling Plan (“Sampling Plan”) on behalf of The Chemours Company FC, LLC (Chemours) pursuant to the requirements of Paragraph 4(b) of the Addendum to Consent Order Paragraph 12 (CO Addendum)

Determination of Table 3 Compounds by LC/MS/MS Chemours Fluoroproducts

SOP No. WS-LC-0031, Rev. 2.6

Table 3 SOP Revisions (WS-LC-0031)

Memorandum

THERMAL OXIDIZER CONTROL EFFICIENCY COMPLIANCE TEST REPORT TEST DATES: 4-5 FEBRUARY 2020

THE CHEMOURS COMPANY FAYETTEVILLE, NORTH CAROLINA