Search Results

Below are the search engine results of your query.

Showing 1831-1840 of 3090 results

Interim Seep Remediation Operation and Maintenance Report #11

Interim Seep Remediation Operation and Maintenance Report #11

CHARACTERIZATION OF PFAS IN PROCESS AND NON-PROCESS WASTEWATER AND STORMWATER

Paragraph 11(d) Ongoing Sampling Final Report: 2021 – 2022 Bimonthly Sampling

STORMWATER TREATMENT SYSTEM SAMPLING PLAN

Geosyntec Consultants of NC, PC (Geosyntec) has prepared this Stormwater Treatment System Sampling Plan (“Sampling Plan”) on behalf of The Chemours Company FC, LLC (Chemours) pursuant to the requirements of Paragraph 4(b) of the Addendum to Consent Order Paragraph 12 (CO Addendum)

Determination of Table 3 Compounds by LC/MS/MS Chemours Fluoroproducts

SOP No. WS-LC-0031, Rev. 2.6

Table 3 SOP Revisions (WS-LC-0031)

Memorandum

THERMAL OXIDIZER CONTROL EFFICIENCY COMPLIANCE TEST REPORT TEST DATES: 4-5 FEBRUARY 2020

THE CHEMOURS COMPANY FAYETTEVILLE, NORTH CAROLINA

FLUOROMONOMERS MANUFACTURING PROCESS VINYL ETHERS NORTH CARBON BED REMOVAL EFFICIENCY AND DIVISION STACK EMISSIONS TEST REPORT TEST DATES: 24 AND 25 SEPTEMBER 2019

THE CHEMOURS COMPANY FAYETTEVILLE, NORTH CAROLINA

INTERIM SEEP REMEDIATION SYSTEM PLAN

Geosyntec Consultants of NC, PC (Geosyntec) has prepared this Interim Seep Remediation System Plan (“Interim Plan”) on behalf of The Chemours Company FC, LLC (Chemours) to provide a design basis for the flow-through cells that are to be installed as the interim seep remediation system at four groundwater seeps at the Chemours Fayetteville Works Site (Figure 1; the Site).

Consent Order Addendum - Submission Pursuant to Paragraph 2.a - August 26, 2021

Please find enclosed the Interim Seep Remediation Seep A Effectiveness Demonstration Report. This report is being submitted by Chemours pursuant to paragraph 2.a of the Addendum to Consent Order Paragraph 12, entered by the Bladen County Superior Court on October 12, 2020.

Seep B Effectiveness Demonstration Report - November 3, 2021

Geosyntec Consultants of NC, P.C. (Geosyntec) has prepared this Interim Seep Remediation Seep B Effectiveness Demonstration Report (“Effectiveness Report”) on behalf of The Chemours Company FC, LLC (Chemours).