Search Results

Below are the search engine results of your query.

Showing 1821-1830 of 3078 results

Opteon™ Park Cakes Case Study (EMEA)

Win with Opteon™ XL40 and savour the sweet success of meeting your cold chain operation needs while remaining sustainable in an F-Gas world.

CFR Long-Term Remedy Performance Monitoring Report #8 (Q4 2024) October - December 2024

This CFR Long-Term Remedy Performance Monitoring Report #8 (“Report”) has been prepared for the Q4 2024 period of October 1 through December 31, 2024, and documents the operation of the interim seep Flow-Through Cells (FTCs), the ex-situ seeps and weeps capture systems (“Ex-Situ Capture Systems”), the groundwater extraction and conveyance system (GWEC), and the groundwater treatment plant (GWTP).

Consent Order Addendum – Submission Pursuant to Paragraph 1.b - September 30, 2024

Please find enclosed the Cape Fear River PFAS Mass Loading Assessment – Second Quarter 2024 Report.

DEQ’s November 3, 2021 “Notice Regarding Chemours’ Obligations Under Consent Order and 15A NCAC 02L .0106 - Offsite Groundwater Assessment and Provision of Replacement Drinking Water Supplies”

As requested by DEQ, Chemours is submitting herewith a “Framework to Assess Table 3+ PFAS in New Hanover, Brunswick, Columbus, and Pender Counties” (the “Assessment Framework”) and an “Interim Four Counties Sampling and Drinking Water Plan (New Hanover, Brunswick, Columbus, and Pender Counties)” which will include the sampling of groundwater from private wells in the four counties as requested by the well owners.

SITE CONVEYANCE NETWORK AND OUTFALL 002 PFAS MASS LOADING CALCULATION PROTOCOL

Geosyntec Consultants of NC, PC (Geosyntec) has prepared this Protocol for establishing current mass loading from Outfall 002 to the Cape Fear River (“Outfall 002 Trendline”) on behalf of The Chemours Company FC, LLC (Chemours) pursuant to the requirements of Paragraph 1(c)(ii) of the Addendum to Consent Order Paragraph 12 (CO Addendum).

Paragraph 11(c) Final Quarterly Report – Addendum 1 May 28, 2021

Please find enclosed an addendum to the Characterization of PFAS in Process and Non-Process Wastewater and Stormwater: Initial Characterization – Final Quarterly Report (Paragraph 11(c) Final Quarterly Report).

Submission of Quarterly Report #5 – Characterization of PFAS in Process and Non-Process Wastewater and Stormwater – Chemours Fayetteville Works, Fayetteville, NC July 31, 2020

Chemours is submitting the enclosed Quarterly Report #5 – Characterization of PFAS in Process and Non-Process Wastewater and Stormwater, prepared by our consultant Geosyntec Consultants of NC, P.C..

Consent Order Addendum – Submission Pursuant to Paragraph 1.b

Please find enclosed the Cape Fear River PFAS Mass Loading Assessment – Second Quarter 2021 Report.

Q2 2022 Mass Load Assessment Appendices

This appendix presents results from the Q2 2022 sampling events described in Section 2 of the main report.

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT - THIRD QUARTER 2021 REPORT - December 23, 2021

Geosyntec Consultants of NC, P.C. (Geosyntec) has prepared this Cape Fear River PFAS Mass Loading Assessment report for The Chemours Company, FC, LLC (Chemours).