Brands and Products
Chemours uses the power of chemistry to create better, reliable solutions.
The future of transport is here.
Discover how Chemours is driving innovation in the Electric Vehicle space with our latest line of advanced performance materials.
Sustainability
Creating a better world through responsible chemistry.
Our 2030 Goals
Our progress towards achieving Chemours’ Corporate Responsibility Commitment goals
Critical Chemistries
Chemours is working to create a better world through the power of our chemistry.
Showing 2201-2210 of 3090 results
Chemours is submitting the Barrier Wall and Groundwater Extraction System 60% Design Report. This report has been prepared pursuant to Paragraph 3.b in the Addendum to Consent Order Paragraph 12 entered by the Bladen County Superior Court on October 12, 2020, which is incorporated into the terms of the Consent Order entered February 25, 2019 between Chemours and the North Carolina Department of Environmental Quality (DEQ) with the Cape Fear River Watch (CFRW).
THE CHEMOURS COMPANY FAYETTEVILLE, NORTH CAROLINA
Paragraph 4(d) of the Addendum to Consent Order Paragraph 12 requires that Chemours complete an investigation to determine whether DuPont non-contact cooling water is causing groundwater containing PFAS to infiltrate into the outfall channel.
Please find enclosed the Cape Fear River PFAS Mass Loading Assessment - Third Quarter 2020 Report
Please find enclosed the Cape Fear River PFAS Mass Loading Assessment - Fourth Quarter 2020 Report
Geosyntec Consultants of NC, P.C. (Geosyntec) and GEOServices, LLC (GEOServices) have prepared this Pre-Design Investigation (PDI) Report Version 2 for The Chemours Company, FC, LLC (Chemours).
This 60% Design report, prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) and GEOServices, LLC (GEOServices) for The Chemours Company FC, LLC (Chemours), describes the components of the remedial action being designed for implementation at the Site pursuant to the requirements of paragraph 3(b) of the Consent Order Paragraph 12 Addendum (COA) among Chemours, the North Carolina Department of Environmental Quality (NCDEQ), and Cape Fear River Watch (CFRW).
(Per Consent Order, Paragraph 8a) October-19
Inventory of Emissions of GenX Compounds (Per Consent Order, Paragraph 8b)
October 25, 2022
Use our database to access product SDS.
Chemours delivers valuable solutions to various industries around the globe.
The world depends on the power of chemistry.