Search Results

Below are the search engine results of your query.

Showing 1871-1880 of 3090 results

CFR Long-Term Remedy Performance Monitoring Report #7 (Q3 2024) July - September 2024

This CFR Long-Term Remedy Performance Monitoring Report #7 (“Report”) has been prepared for the Q3 2024 period of July 1 through September 30, 2024, and documents the operation of the interim seep Flow-Through Cells (FTCs), the ex-situ seeps and weeps capture systems (“Ex-Situ Capture Systems”), the groundwater extraction and conveyance system (GWEC), and the groundwater treatment plant (GWTP).

Submission of Quarterly Progress Report Pursuant to Consent Order Paragraph 28 - October 28, 2024

Chemours is pleased to submit the enclosed quarterly progress report, as required under paragraph 28 of the Consent Order entered by the Superior Court for Bladen County on February 25, 2019.

Consent Order Addendum - Submission Pursuant to Paragraph 2.c.v - December 20, 2024

Please find enclosed the CFR Long-Term Remedy Performance Monitoring Report #7 (Q3 2024).

PFAS NON-TARGETED ANALYSIS AND METHODS INTERIM REPORT #10

Process and Non-Process Wastewater and Stormwater

CHARACTERIZATION OF PFAS IN PROCESS AND NON-PROCESS WASTEWATER AND STORMWATER Quarterly Report #2

This report was prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours) to provide a quarterly update on the identification and concentrations of per- and polyfluoroalkyl substances (“PFAS”) in process wastewater, non-process wastewater, and stormwater at the Chemours Fayetteville Works, North Carolina site

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT - APPENDIX A

This appendix presents results from the Q2 2024 sampling events described in Section 2 of the main report.

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT - APPENDIX A

This appendix presents results from the Q3 2024 sampling events described in Section 2 of the main report.

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT – SECOND QUARTER 2024

Geosyntec Consultants of NC, P.C. (Geosyntec) has prepared this Cape Fear River PFAS Mass Loading Assessment - First Quarter 2024 Report for The Chemours Company, FC, LLC (Chemours).

Consent Order Addendum - Submission Pursuant to Paragraph 2.c.v - September 30, 2024

Consent Order Addendum - Submission Pursuant to Paragraph 2.c.v

Consent Order Progress Report For Third Quarter 2024

Submissions to the State of North Carolina and Cape Fear River Watch