CFR Long-Term Remedy Performance Monitoring Report #6 (Q2 2024) April – June 2024
This CFR Long-Term Remedy Performance Monitoring Report #6 (“Report”) has been prepared for the Q2 2024 period of April 1 through June 30, 2024, and documents the operation of the interim seep Flow-Through Cells (FTCs), the ex-situ seeps and weeps capture systems (“Ex-Situ Capture Systems”), the groundwater extraction and conveyance system (GWEC), and the groundwater treatment plant (GWTP).