CFR Long-Term Remedy Performance Monitoring Report #8 (Q4 2024) October - December 2024
This CFR Long-Term Remedy Performance Monitoring Report #8 (“Report”) has been prepared for the Q4 2024 period of October 1 through December 31, 2024, and documents the operation of the interim seep Flow-Through Cells (FTCs), the ex-situ seeps and weeps capture systems (“Ex-Situ Capture Systems”), the groundwater extraction and conveyance system (GWEC), and the groundwater treatment plant (GWTP).