Résultats de la recherche

Voici ci-dessous les résultats du moteur de recherche pour votre requête.

Montrant 2581-2590 de 2745 résultats

Consent Order Progress Report For Second Quarter 2025

Submissions to the State of North Carolina and Cape Fear River Watch

RESIDENTIAL POTABLE WELL SAMPLING LOCATIONS WITH RESULTS AS OF JUNE 30, 2025

Submission of Quarterly Progress Report Pursuant to Consent Order Paragraph 28 - July 29, 2025

Chemours is pleased to submit the enclosed quarterly progress report, as required under paragraph 28 of the Consent Order entered by the Superior Court for Bladen County on February 25, 2019.

Appendix A Cape Fear River PFAS Mass Loading Model

The objective of this appendix is to estimate the mass discharge from the identified PFAS transport pathways using a Cape Fear River mass loading model developed and described in the Cape Fear River Mass Loading Calculation Protocol Version 2 (Geosyntec, 2020a) and to assess contributions by pathway.

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT – SECOND QUARTER 2025

Geosyntec Consultants of NC, P.C. (Geosyntec) has prepared this Cape Fear River PFAS Mass Loading Assessment - Second Quarter 2025 Report for The Chemours Company, FC, LLC (Chemours).

CFR Long-Term Remedy Performance Monitoring Report #10 (Q2 2025) April - June 2025

This Cape Fear River (CFR) Long-Term Remedy Performance Monitoring Report #10 (“Report”) has been prepared for the Q2 2025 period of April 1 through June 30, 2025, and documents the operation of the ex-situ seeps and weeps capture systems (“Ex-Situ Capture Systems”), the groundwater extraction and conveyance system (GWEC), the groundwater treatment plant (GWTP), and the interim seep Flow-Through Cells (FTCs).

Opteon™ SF33 Technical Information

Opteon™ SF33 (HFO-1336mzz-Z) is a proprietary hydrofluoroolefin (HFO) specialty fluid with zero ozone depletion potential (ODP) and very low global warming potential (GWP) of 2, 100-yr ITH.

Consent Order Addendum - Submission Pursuant to Paragraph 2.c.v - September 30, 2025

Please find enclosed the CFR Long-Term Remedy Performance Monitoring Report #10 (Q2 2025).

Consent Order Addendum – Submission Pursuant to Paragraph 1.b - September 30, 2025

Please find enclosed the Cape Fear River PFAS Mass Loading Assessment – Second Quarter 2025 Report.

Spain PO Terms and Conditions Spanish