Resultados de búsqueda

A continuación, encontrará los resultados del motor de búsqueda para su consulta.

Demostración 2361-2370 de 2384 resultados

Proposed Consent Order Paragraph 11(b) Sampling Plan

Paragraph 11(b) of the proposed Consent Order states that “By December 31, 2018, Chemours shall submit a sampling plan to DWR for approval.”

Strictly Controlled Conditions Template

Confirmation of Application of Strictly Controlled Conditions According to Regulation (EC) No. 1907/2006 (REACH Regulation)

Chambers Works Surface Water Renewal Permit Action

Interim SEEP Remediation Operation and Maintenance Report #6

This Operations and Maintenance Report #6 (O&M Report #6) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from November 1 through December 31, 2021.

DEQ’s November 3, 2021 “Notice Regarding Chemours’ Obligations Under Consent Order and 15A NCAC 02L .0106 - Offsite Groundwater Assessment and Provision of Replacement Drinking Water Supplies”

As requested by DEQ, Chemours is submitting herewith a “Framework to Assess Table 3+ PFAS in New Hanover, Brunswick, Columbus, and Pender Counties” (the “Assessment Framework”) and an “Interim Four Counties Sampling and Drinking Water Plan (New Hanover, Brunswick, Columbus, and Pender Counties)” which will include the sampling of groundwater from private wells in the four counties as requested by the well owners.

Belle ISO 9001 Certificate

EN ISO-9001: 2015; BS EN ISO-9001: 2015; ANSI/ASQ Q9001: 2015 for the following scope of registration 2869 (US): Industrial Organic Chemicals

PFAS Non-Targeted Analysis and Methods Interim Report #5 June 30, 2022

Submission of PFAS Non-Targeted Analysis and Methods Interim Report Chemours Fayetteville Works, Fayetteville, NC

TW EIA 110 02 110 04

TW EIA 111 08 111 10

PFAS NON-TARGETED ANALYSIS AND METHODS DEVELOPMENT PLAN January 2019

Process and Non-Process Wastewater and Stormwater