Resultados de búsqueda

A continuación, encontrará los resultados del motor de búsqueda para su consulta.

Demostración 2071-2080 de 2745 resultados

Out Outfall 002 GAC Pilot Study Interim Results Report Chemours Fayetteville, North Carolina Facility August 2019

Parsons Infrastructure (Parsons) is pleased to present this interim report summarizing results obtained todate during operation of the Old Outfall 002 (OOF2) GAC pilot treatment system.

Proposed Drinking Water Health Advisory Value for GenX – Damian Shea – April 2018

The widespread occurrence and subsequent environmental concerns of long-chain perfluoroalkyl acids (PFAAs) such as perfluorooctane sulfonate (PFOS) and perfluorooctanoic acid (PFOA) has led to the production and use of alternative polymer processing aids with more environmentally favorable chemical and biological properties

Under Sink Reverse Osmosis (RO) Systems Fact Sheet and Frequently Asked Questions

What is reverse osmosis, or RO, and why am I receiving this information?

Starting the New Year with a Cleaner River

Inventory of Emissions of GenX Compounds (Per Consent Order, Paragraph 8a) June-19

Chemours Company - Fayetteville Works

SEMI-WORKS MANUFACTURING PROCESS EMISSIONS TEST REPORT TEST DATES: 10-11 JANUARY 2019

THE CHEMOURS COMPANY FAYETTEVILLE, NORTH CAROLINA

BEAU HODGE, PG

FILTER, FILTER ON THE WALL, WHOSE THE FAIREST OF THEM ALL?

There is a lot of discussion surrounding which filtration method for home use is best at filtering out the toxins specific to the Cape Fear River.

Submission Pursuant to Proposed Consent Order Paragraph 8 February 2019

Pursuant to Paragraph 8.b.i of the proposed Consent Order, please find enclosed the final reports from Weston Solutions, Inc. (“Weston”) for the emissions testing of GenX Compounds at the Polymer Processing Aid (“PPA”), Vinyl Ethers South (“VES”), and Semi-Works stacks conducted at Fayetteville Works in early January 2019.

Submission Pursuant to Consent Order Paragraph 18

Chemours is pleased to submit the enclosed On and Offsite Assessment for Fayetteville Works, pursuant to paragraph 18 of the Consent Order entered by the Superior Court for Bladen County on February 25, 2019.