Resultados de búsqueda

A continuación, encontrará los resultados del motor de búsqueda para su consulta.

Demostración 1541-1550 de 2754 resultados

PFAS NON-TARGETED ANALYSIS AND METHODS INTERIM REPORT #10

Process and Non-Process Wastewater and Stormwater

CHARACTERIZATION OF PFAS IN PROCESS AND NON-PROCESS WASTEWATER AND STORMWATER Quarterly Report #2

This report was prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours) to provide a quarterly update on the identification and concentrations of per- and polyfluoroalkyl substances (“PFAS”) in process wastewater, non-process wastewater, and stormwater at the Chemours Fayetteville Works, North Carolina site

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT - APPENDIX A

This appendix presents results from the Q2 2024 sampling events described in Section 2 of the main report.

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT - APPENDIX A

This appendix presents results from the Q3 2024 sampling events described in Section 2 of the main report.

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT – SECOND QUARTER 2024

Geosyntec Consultants of NC, P.C. (Geosyntec) has prepared this Cape Fear River PFAS Mass Loading Assessment - First Quarter 2024 Report for The Chemours Company, FC, LLC (Chemours).

Consent Order Addendum - Submission Pursuant to Paragraph 2.c.v - September 30, 2024

Consent Order Addendum - Submission Pursuant to Paragraph 2.c.v

Consent Order Progress Report For Third Quarter 2024

Submissions to the State of North Carolina and Cape Fear River Watch

Consent Order Addendum – Submission Pursuant to Paragraph 1.b - March 26, 2025

Please find enclosed the Cape Fear River PFAS Mass Loading Assessment – Fourth Quarter 2024 Report.

CFR Long-Term Remedy Performance Monitoring Report #6 (Q2 2024) April – June 2024

This CFR Long-Term Remedy Performance Monitoring Report #6 (“Report”) has been prepared for the Q2 2024 period of April 1 through June 30, 2024, and documents the operation of the interim seep Flow-Through Cells (FTCs), the ex-situ seeps and weeps capture systems (“Ex-Situ Capture Systems”), the groundwater extraction and conveyance system (GWEC), and the groundwater treatment plant (GWTP).

Consent Order Addendum – Submission Pursuant to Paragraph 1.b - December 20, 2024

Please find enclosed the Cape Fear River PFAS Mass Loading Assessment – Third Quarter 2024 Report.