Resultados de búsqueda

A continuación, encontrará los resultados del motor de búsqueda para su consulta.

Demostración 1511-1520 de 2754 resultados

Onsite Seeps Long-Term Loading Baseline Report - September 2023

Geosyntec Consultants of NC, P.C. (Geosyntec) has prepared this Onsite Seeps Long-Term Loading Baseline Report (Seeps Baseline Report) for The Chemours Company, FC, LLC (Chemours) for the four onsite seeps, Seeps A, B, C and D at the Chemours Fayetteville Works site (the Site).

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT - SECOND QUARTER 2021 REPORT

Geosyntec Consultants of NC, P.C. (Geosyntec) has prepared this Cape Fear River PFAS Mass Loading Assessment report for The Chemours Company, FC, LLC (Chemours). Chemours operates the Fayetteville Works facility in Bladen County, North Carolina (the Site).

Q2 2020 Mass Load Assessment TextTablesFigures

Cape Fear River PFAS Mass Loading Assessment - Second Quarter 2022 Report - September 2022

Geosyntec Consultants of NC, P.C. (Geosyntec) has prepared this Cape Fear River PFAS Mass Loading Assessment report for The Chemours Company, FC, LLC (Chemours).

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT – SECOND QUARTER 2023

Geosyntec Consultants of NC, P.C. (Geosyntec) has prepared this Cape Fear River PFAS Mass Loading Assessment - Second Quarter 2023 Report for The Chemours Company, FC, LLC (Chemours).

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT - APPENDIX A

This appendix presents results from the Q3 2023 sampling events described in Section 2 of the main report.

CAPE FEAR RIVER PFAS MASS LOADING ASSESSMENT - APPENDIX A

This appendix presents results from the Q2 2023 sampling events described in Section 2 of the main report.

INTERIM SEEP REMEDIATION OPERATION AND MAINTENANCE REPORT #11

CAPE FEAR RIVER PFAS LOADING REDUCTION PLAN – SUPPLEMENTAL INFORMATION REPORT

The Cape Fear River PFAS Loading Reduction Plan (Geosyntec, 2019a) was submitted to the North Carolina Department of Environmental Quality (NCDEQ) and Cape Fear River Watch (CFRW) on August 26, 2019 pursuant to Paragraph 12 of the Consent Order among Chemours, NCDEQ, and (CFRW).

Submission of Quarterly Progress Report Pursuant to Consent Order Paragraph 28 - January 29, 2024

Chemours is pleased to submit the enclosed quarterly progress report, as required under paragraph 28 of the Consent Order entered by the Superior Court for Bladen County on February 25, 2019.